RAMADA EASTSIDE
BACKGROUND
The Hotel @ New York City -161 Lexington Avenue is a well-maintained building, however normal wear and tear through the years has led to escalating energy consumption. Major challenges for the 161 Lexington included:
-
Deteriorating equipment, operating past its useful life.
-
90 HP low pressure steam boiler, using No. 2 fuel oil, running long past its useful life.
HOW GEATAIN ENGINEERING HELPED
Geatain Engineering implemented the following step by step analysis:
-
Spoke with operating staff to understand building infrastructure.
-
Surveyed building to understand existing equipment operations and limitations.
-
Compared available energy conservation measures to existing building equipment and operations.
-
Brainstormed several thoughtful and innovative solutions.
-
Verified applicability of measures to building equipment.
-
Determined capital costs and savings.
BENEFITS
-
Financing improvements at no cost to hotel.
-
Switching to biofuel provides more clean, sustainable and environmentally friendly heating.
CHALLENGES
• Deteriorated infrastructure, antiquated equipment, high energy bills
SOLUTIONS
• Heating controls
• Boiler replacement
• Water heater installation
• Biofuel alternative fuel
• Motor replacement
LIFE-CYCLE SAVINGS
$ 4,221,200